JED – Halter Offices

JED – Halter Offices

workplace office innovation redevelopment

By relocating its headquarters to Schlieren in Zurich, Halter become the second anchor tenant at JED, the redevelopment of the former NZZ print works.

Halter is one of the largest construction companies in Switzerland. By relocating to JED, Halter saw the opportunity to establish its own construction hub that now brings all its sister companies under one roof. The nature of the industry, flexibility in the use of spaces and openness were the key elements that initiated the raw design concept.

Atrium forms the centrepiece

An internal atrium that stretches from the ground floor to the double-volume upper floor forms the centrepiece of Halter’s workspaces. It visually connects all five floors and delivers ample daylight into the interior of the building. It is a bright and visually exciting space that fuses the building’s historical character with contemporary features.

In the middle of the atrium stands a bold steel staircase that looks as if it has been folded down from the first floor. The staircase has a sculptural appearance and creates a strong sense of identity. The rhombus-shaped banister pattern is matched with a rectangular pattern on the steel railings that line the atrium.

  • Location

    JED, Zürcherstrasse 39

    Schlieren, Switzerland

  • Client

    Swiss Prime Site

  • Net floor area

    4.700 m2

  • Project completed
    12.2020
Workspaces instead of plant rooms

The workspaces are configured in the shape of a cross that results from the existing structure of the former NZZ print works and the new storey that was built as an extension of the former heating and ventilation plant rooms. The resulting volume that is further extended with dormer windows offers space for a differentiated interplay of work zones, closed meeting boxes, shielded concentration areas and inviting communal areas.

Showcase the industrial past

To retain the industrial atmosphere, the former printing halls were drawn back to the shell construction. All spaces feature unplastered concrete or exposed brickwork walls, the original roof trusses that add a touch of industrial charm and open ceiling construction made of steel and trapezoidal sheet metal dating from the 1980s.

The new extension, combined with the dormer windows, and the introduction of the atrium required complex interventions in the existing building. This approach has certainly paid off, as we have managed to deliver unique spaces with unmistakable identity.

Jessica Mentz
Associate, Project Lead
Project team
Project Director

Stefan Camenzind

Project Lead

Jessica Mentz

Core Team

Katarzyna Kosciuk, Zhiyang Chiu, Marco Noch, Patrik Uihlein

Photography

Peter Wuermli

This site uses cookies, which may include third party cookies, to improve and personalise your experience on our website. By using our site you accept the terms of our Privacy Policy 

  • Necessary cookies enable core functionality. The website cannot function properly without these cookies, and can only be disabled by changing your browser preferences.